cambridgema-gov/building-permits-new-construction-9qm7-wbdc
Icon for Socrata external plugin
 
Readme
Updated 18 hours ago
Indexed 3 hours ago

Building Permits: New Construction

List of permits for new building construction in Cambridge. This dataset derives from Cambridge's ViewPoint permitting system.

Columns

NameSocrata field nameColumn name in sgr mountData typeDescription
AddressaddressaddressText
New Food Establishmentnew_food_establishmentnew_food_establishmentTextWill the proposed work result in a new food establishment?
Building Removalbuilding_removalbuilding_removalCheckboxWill removal of buildings be required for this construction?
Electrical Costelectrical_costelectrical_costNumberElectrical Cost of Construction
Record NumberididTextPermit ID
cambridge_cdd_zoning:@computed_region_swkg_bavi:@computed_region_swkg_baviNumber
Finish Materialsfinish_materialsfinish_materialsTextFood Est: Describe the finish materials for the floor, walls, ceiling and cove
LatitudelatitudelatitudeNumber
Impervious Coverimpervious_coverimpervious_coverCheckboxWill the proposed work result in an increase to the property’s impervious cover?
Building Costbuilding_costbuilding_costNumberBuilding Cost of Construction
Method Of Removalmethod_of_removalmethod_of_removalTextConstruction: Method of Removal
cambridge_neighborhoods:@computed_region_rffn_qbt6:@computed_region_rffn_qbt6Number
Police Response Districts:@computed_region_v7jj_366k:@computed_region_v7jj_366kNumber
Address for Mapping (zip)geocoded_column_zipgeocoded_column_zipText
Current Property Usecurrent_property_usecurrent_property_useTextZoning I: Current Property Use
Right-Of-Wayright_of_wayright_of_wayCheckboxWill the proposed work result in a new, abandoned or modified curb cut into the public right-of-way?
Submit Datesubmit_datesubmit_dateCalendar dateDate application for permit was submitted
Issue Dateissue_dateissue_dateCalendar dateDate permit was issued
Construction Typeconstruction_typeconstruction_typeTextProposed: Building Construction Type
Proposed Building Heightbuilding_heightbuilding_heightTextProposed: Building Height (feet)
Gross Square Footagegross_square_footagegross_square_footageTextProposed: Gross Square Footage
Long-Term Bike Parkinglong_term_bike_parkinglong_term_bike_parkingTextNumber of Proposed Off-Street Bicycle Parking Spaces (Long Term)
Proposed Number of Dwelling Unitsproposed_count_of_dwellingproposed_count_of_dwellingNumberZoning I: Proposed number of dwelling units
BZA Numberbza_numberbza_numberTextSpecial: Board of Zoning Appeal (BZA) Case Number
Special Permit Numberspecial_permit_numberspecial_permit_numberTextSpecial: Planning Board Special Permit Number
LongitudelongitudelongitudeNumber
Address for Mappinggeocoded_columngeocoded_columnPointAddress geocoded so that it can be used to create a map on the open data portal
Police Neighborhood Regions:@computed_region_guic_hr4a:@computed_region_guic_hr4aNumber
Census Blocks 2010:@computed_region_e4yd_rwk4:@computed_region_e4yd_rwk4Number
Appeal (BZA) Caseappeal_bza_caseappeal_bza_caseCheckboxSpecial: Is this application subject to a Board of Zoning Appeal (BZA) Case?
Cooking Typecooking_typecooking_typeTextCooking Equipment Type
Proposed Building Useproposed_building_useproposed_building_useText
Final Costfinal_costfinal_costNumberFinal Cost of Construction
Storm Sewer Connectionsstorm_sewer_connectionsstorm_sewer_connectionsCheckboxWill the proposed work result in new, abandoned, or replaced sanitary storm sewer connections?
Gas Costgas_costgas_costNumberGas Cost of Construction
Total Cost Of Constructiontotal_cost_of_constructiontotal_cost_of_constructionNumber
Debris Removal Locationdebris_removal_locationdebris_removal_locationTextConstruction debris will be disposed at/by
HVAC Costhvac_costhvac_costNumberHVAC Cost of Construction
Employment Arrangementemployment_arrangementemployment_arrangementTextSelect the option that best describes you or your company's employment arrangement.
Debris Removal Datedebris_removal_datedebris_removal_dateCalendar dateConstruction Debris Removal Completion Date
Property Use (Other)property_use_otherproperty_use_otherTextZoning I: Describe current property use (other)
Architect: Firmarchitect_firmarchitect_firmText
Short-Term Bike Parkingshort_term_bike_parkingshort_term_bike_parkingTextNumber of Proposed Off-Street Bicycle Parking Spaces (Short Term)
Stories (Above Grade)stories_above_gradestories_above_gradeTextProposed: Number of Stories (Above Grade)
Address for Mapping (state)geocoded_column_stategeocoded_column_stateText
Plumbing Costplumbing_costplumbing_costNumberPlumbing Cost of Construction
Description Of Workdescription_of_workdescription_of_workTextDetailed Description of Work
Board Special Permitboard_special_permitboard_special_permitCheckboxSpecial: Is this application subject to a Planning Board Special Permit?
Vehicle Parking Spacesvehicle_parking_spacesvehicle_parking_spacesNumberNumber of Proposed Off-Street Vehicle Parking Spaces
Address for Mapping (address)geocoded_column_addressgeocoded_column_addressText
StatusstatusstatusTextStatus of application
Roof/Foundation Drainroof_foundation_drainroof_foundation_drainCheckboxWill the proposed work result in the addition or alteration of a roof or foundation drain that discharges to the City?
Other Cooking Equipmentother_cooking_equipmentother_cooking_equipmentTextFood Est: Other Cooking Equipment
Temporary Dumpster Permittemporary_dumpster_permittemporary_dumpster_permitTextWould you like to apply for a temporary dumpster permit as part of this building permit application?
Basement Plumbing Fixturebasement_plumbing_fixturebasement_plumbing_fixtureCheckboxWill the proposed work result in the addition or replacement of a basement plumbing fixture?
Proposed Loading Facilitiesproposed_loading_facilitiesproposed_loading_facilitiesTextNumber of Proposed Loading Facilities
Proposed Loading Baysproposed_loading_baysproposed_loading_baysTextNumber of Proposed Loading Bays
Dumpster Numberdumpster_nodumpster_noTextConstruction: Cambridge Dumpster Licence #
Air Cafe Windowsair_cafe_windowsair_cafe_windowsTextWill the food establishment include open air cafe windows?
CertificatecertificatecertificateTextCertificate of Occupancy Required
Proposed Property Useproposed_property_useproposed_property_useTextZoning I: Proposed Property Use
Address for Mapping (city)geocoded_column_citygeocoded_column_cityText
Construction Dewateringconstruction_dewateringconstruction_dewateringCheckboxWill the proposed work require construction dewatering during any phase of the project?
 
Preview
  • building_permits_new_construction
     
Upstream Metadata