cambridgema-gov/roof-building-permit-79ih-g44d
Icon for Socrata external plugin
 
Readme
Updated 17 hours ago
Indexed 2 hours ago

Roof - Building Permit

Permits related to replacing a roof covering in the City of Cambridge.

Columns

NameSocrata field nameColumn name in sgr mountData typeDescription
Dwelling Unitsdwelling_unitsdwelling_unitsTextNumber of Dwelling Units in the building
License Numberlicense_numberlicense_numberTextLicense Number
LatitudelatitudelatitudeNumber
Roof Covering Classificationroof_covering_classificationroof_covering_classificationTextProvide the minimum roof covering classification that will be provided
License Expiration Datelicense_expiration_datelicense_expiration_dateCalendar dateLicense Expiration Date
Licensed Classlicensed_classlicensed_classTextLicensed: Class
Type of Demolitiontype_of_demolitiontype_of_demolitionText
StatusstatusstatusTextStatus of roof construction
Method of Removalmethod_of_removalmethod_of_removalTextMethod of Removal (Demolition)
Above Deck Insulation Replacementabove_deck_insulationabove_deck_insulationTextReplacement of above deck insulation is required. Provide the R-value of new insulation to be installed
Coordinates for Mappinggeocoded_columngeocoded_columnPointUse this column to create maps with the open data portal's mapping tools.
Record NumberididTextPermit ID
AddressaddressaddressTextAddress where roof work is being done
Issue Dateissue_dateissue_dateCalendar dateDate when permit was issued
Description of Workroof_work_descriptionroof_work_descriptionTextDetailed Description of Work, including attachment methods, use of underlayment, and description of fasteners to be use
Demolition Descriptiondemolition_descriptiondemolition_descriptionText
Description-Otherdescription_otherdescription_otherTextDescription: Other / Mixed
Deck Insulation Tapereddeck_insulation_tapereddeck_insulation_taperedCheckboxIs the above deck insulation tapered?
Roof Deck Insulation Removalroof_deck_insulation_removalroof_deck_insulation_removalCheckboxDoes the work include removal of existing insulation entirely above a roof deck?
Coordinates for Mapping (state)geocoded_column_stategeocoded_column_stateText
Temporary Dumpster Permittemporary_dumpster_permittemporary_dumpster_permitCheckboxWould you like to apply for a temporary dumpster permit as part of this building permit application?
Roof Structure Sloperoof_structure_sloperoof_structure_slopeCheckboxIs the roof structure sloped less than 3:12 OR is there rigid insulation that is tapered?
Temporary Dumpster Counttemporary_dumpster_counttemporary_dumpster_countTextHow many temporary dumpsters would you like to apply for?
Condo Associationcondo_associationcondo_associationCheckboxIs the property part of a condo association?
Building usebuilding_usebuilding_useTextType of building (home, commercial, etc.)
Police Neighborhood Regions:@computed_region_guic_hr4a:@computed_region_guic_hr4aNumber
Police Response Districts:@computed_region_v7jj_366k:@computed_region_v7jj_366kNumber
cambridge_neighborhoods:@computed_region_rffn_qbt6:@computed_region_rffn_qbt6Number
cambridge_cdd_zoning:@computed_region_swkg_bavi:@computed_region_swkg_baviNumber
Census Blocks 2010:@computed_region_e4yd_rwk4:@computed_region_e4yd_rwk4Number
Photovoltaic Productsphotovoltaic_productsphotovoltaic_productsCheckboxWill building-integrated photovoltaic products be used as the roof covering?
Coordinates for Mapping (zip)geocoded_column_zipgeocoded_column_zipText
Firm Namefirm_namefirm_nameTextName of firm working on roof construction
Cost of Constructionbuilding_costbuilding_costNumberBuilding cost of construction
Submit Datesubmit_datesubmit_dateCalendar dateApplicant Submit Date
Debris Removal Datedebris_removal_datedebris_removal_dateCalendar dateConstruction debris removal will be completed by
Dumpster License Numberdumpster_license_numberdumpster_license_numberTextCambridge Dumpster License Number
Construction Typeconstruction_typeconstruction_typeText
LongitudelongitudelongitudeNumber
Debris Removal Locationdebris_removal_locationdebris_removal_locationTextConstruction debris will be disposed at/by
Coordinates for Mapping (city)geocoded_column_citygeocoded_column_cityText
Flashing Installationflashing_installationflashing_installationCheckboxWill new flashing or fascia be required and installed because of this permit?
Roofing Materialroofing_materialroofing_materialTextSelect the roofing material that will be installed
Proposed Work Descriptionproposed_work_descriptionproposed_work_descriptionTextSelect the option that best describes the proposed work
Layers of Roof Coveringlayers_of_roof_coveringlayers_of_roof_coveringTextHow many existing layers of roof covering will remain underneath the new roof covering?
Coordinates for Mapping (address)geocoded_column_addressgeocoded_column_addressText
Owner-Occupiedowner_occupiedowner_occupiedCheckboxIs the property owner-occupied?
 
Preview
  • roof_building_permit
     
Upstream Metadata