ny-gov/retail-and-bulk-energy-storage-incentive-programs-ugya-enpy
Icon for Socrata external plugin
 
Readme
Updated 1 month ago
Indexed 2 hours ago

Retail and Bulk Energy Storage Incentive Programs Reported by NYSERDA: Beginning 2019

Energy storage is critical to New York’s clean energy future. As renewable power sources like wind and solar provide a larger portion of New York’s electricity, storage will allow clean energy to be available when and where it is most needed. NYSERDA’s retail and bulk storage incentive programs are directed at achieving New York’s 3,000 MW by 2030 energy storage goal and 1,500 MW by 2025 energy storage target, codified in the Climate Leadership and Community Preservation Act. In December 2018, the New York Public Service Commission (PSC) issued a landmark energy storage order establishing the 3,000 MW by 2030 goal and authorizing the incentive programs. Details on the incentive structure and design are available at https://www.nyserda.ny.gov/energystorage. Retail and Bulk Energy Storage Incentive Programs Reported by NYSERDA: Beginning 2019 dataset includes data points for projects completed and approved in the pipeline (not yet installed) in NYSERDA’s Incentive Programs beginning April 2019.

The New York State Energy Research and Development Authority (NYSERDA) offers objective information and analysis, innovative programs, technical expertise, and support to help New Yorkers increase energy efficiency, save money, use renewable energy, and reduce reliance on fossil fuels. To learn more about NYSERDA’s programs, visit nyserda.ny.gov or follow us on Twitter, Facebook, YouTube, or Instagram.

Columns

NameSocrata field nameColumn name in sgr mountData typeDescription
Project Statusproject_statusproject_statusTextEither Completed or Approved. Complete indicates projects that are interconnected and operational, and closed out the project application. Approved indicates projects in the pipeline with an active application that are not yet completed. Pipeline projects are subject to change
Battery Cell Manufacturerbattery_cell_manufacturerbattery_cell_manufacturerTextThe manufacturer of the battery cells. For thermal or other forms of energy storage, the manufacturer of the hardware. Blank cells represent data that were not required or are not currently available
Energy Storage Power Capacity (kWac)energy_storage_power_capacityenergy_storage_power_capacityNumberRating of the electric power that can be delivered from an energy storage project in alternating current (AC) power
Installed Energy Storage Energy Capacity (kWhac)installed_energy_storageinstalled_energy_storageNumberUsable installed energy storage capacity measured in alternating current (AC) power. It is equal to the total capacity measured during a complete discharge from a 100% usable state of charge, performed in accordance with the storage manufacturer’s specifications, on the commercial operation date
Date Completeddate_completeddate_completedCalendar dateDate NYSERDA recognized the project as interconnected and operational, and closed out the project application. Blank cells represent pipeline data for projects not yet completed
ZIP Codezip_codezip_codeTextZIP code for project location. Blank cells represent data that were not required or are not currently available
CountycountycountyTextName of county for project location
CitycitycityTextName of city for project location
AddressaddressaddressTextName of street for project location. Blank cells represent data that were not required or are not currently available
Project Nameproject_nameproject_nameTextDescription of project
Metering Methodmetering_methodmetering_methodTextHow the energy storage system was interconnected; either Community DG, Remote net metering, Bulk, or On-site metering. On-site metering is with customer load, and Community DG, Remote net metering, and Bulk are not. Bulk projects provide wholesale market services
NYSERDA Funding Amountnyserda_funding_amountnyserda_funding_amountNumberAmount of project incentives approved or paid by NYSERDA in USD
ContractorcontractorcontractorTextName of entity responsible for installation of the project
Date Project Approveddate_project_approveddate_project_approvedCalendar dateDate project application was approved by the program. Dates before April 2019 reflect the original approval date for already approved NY-Sun projects that subsequently added energy storage during or after April 2019
NYISO Zonenyiso_zonenyiso_zoneTextName of New York Independent System Operator load zone for project location
Electric Utilityelectric_utilityelectric_utilityTextName of electric utility service provider for project location
Application Numberapplication_numberapplication_numberTextUnique identifier for project
Paired With Solarpaired_with_solarpaired_with_solarTextIndicates whether the energy storage system is interconnected with and charged by a paired solar electric PV system; either Yes or No
Program Typeprogram_typeprogram_typeTextName of program type; either Retail or Bulk
StatestatestateTextNew York State
Reporting Periodreporting_periodreporting_periodCalendar dateThe time period covered by the data set
Storage Technology Typestorage_technology_typestorage_technology_typeTextDefines the type of energy storage system. For battery storage projects, the battery chemistry type is shown
 
Preview
  • retail_and_bulk_energy_storage_incentive_programs
     
Upstream Metadata